Search for more Public Notices in your area
Highways England
Traffic

M25, M20 & M26 MOTORWAYS AND A2 & A21 TRUNK ROADS TEMPORARY TRAFFIC RESTRICTIONS

Notice ID: MFN0603093

Notice effective from
24th March 2021 to 23rd April 2021

M25, M20 & M26 MOTORWAYS AND A2 & A21 TRUNK ROADS
TEMPORARY TRAFFIC RESTRICTIONS
Notice is hereby given that Highways England Company Limited intends to make an Order on the M25, M20 and M26 Motorways and the A2 and A21 Trunk Roads in the Counties of Kent and Surrey, and Unitary Authorities of Windsor & Maidenhead and Slough, and the London Borough of Hillingdon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road.
The effect of the Order would be to:-
1. authorise the phased overnight closure of -
(a) the anti-clockwise carriageway of the M25 between Junction 7 (M23 Junction 8) and Junction 2 (A2);

(b) the clockwise carriageway of the M25 Junction 6 (A22) and Junction 11 (A320);

(c) the anti-clockwise carriageway of the M25 between Junction 11 (A320) and Junction 8 (A217);

(d) the clockwise carriageway of the M25 between Junction 13 (A30) and Junction 14 (A3113/Heathrow Spur Road);

(e) the eastbound carriageway of the M26 between the link road (connecting the anti-clockwise carriageways of the M25) at M25 Junction 5 (A21) and Junction 2 (A20);

(f) the westbound carriageway of the M26 between Junction 2 (A20) (A21) and the link road (connecting the clockwise carriageways of the M25) at M25 Junction 5;

(g) the London-bound carriageway of the M20 between Junction 3 (M26) and Junction 1 (M25 Junction 3/A20);

(h) the London-bound carriageway of the A2 between Darenth Interchange (M25 Junction 2) and Dartford Heath Interchange (A2018);

(i) all slip roads leading to and from the lengths of carriageway described above;

(j)the slip road connecting to the clockwise carriageway of the M25 from the northbound carriageway of the M25 Spur Road (connecting from the A21) at Junction 5 (M26/A21);

(k) the slip road leading from the clockwise carriageway of the M25 at Junction 6 (A22);

(I) the link road connecting to the anti-clockwise carriageway of the M25 from the London-bound carriageway of the M40 between its diverge point (with the road connecting to the clockwise carriageway of the M25) and its merge point (with the road connecting from the eastbound carriageway of the M40) at Junction 16 (M40 Junction 1A);

(m) the slip road leading to the clockwise carriageway of the M25 at Junction 18 (A404);

(n) the slip road leading from the clockwise carriageway of the M25 at Junction 18 (A404);

(o) the slip road connecting the anti-clockwise carriageway of the M25 to the southbound carriageway of the M25 Spur Road (connecting to the A21) at Junction 5 (M26/A21);

(p) the link road connecting the anti-clockwise carriageway of the M25 to the eastbound carriageway of the M25 Heathrow Spur Road at Junction 14 (A3113);

(q) the link road connecting from the anti-clockwise carriageway of the M25 to the west-bound carriageway of the M4, between its diverge point (with the road connecting to the London-bound carriageway of the M3) and its merge point (with the road connecting from the clockwise carriageway of the M25) at Junction 15 (M4 Junction 4B);

(r) the link road connecting the London-bound carriageway of the M20 to the anti-clockwise carriageway of the M25 at Junction 1 (M25 Junction 3/A20);

(s) the slip road connecting to the clockwise carriageway of the M25 from the northbound carriageway of the
M25 Spur Road (connecting from the A21) at Junction 5 (M26/A21);

(t) both carriageways of the M25 spur road connecting the Junction 4 roundabout to and from Hewitts Roundabout;

(u) the link road connecting the London-bound carriageway of the M20 to the anti-clockwise carriageway of the M25 at Junction 1 (M25 Junction 3/A20);

(v) the slip road leading to the London-bound
carriageway of the A2 from the roundabout at Darenth Interchange (M25 Junction 2/A282);

(w) the slip road leading from the coast-bound carriageway of the A2 at Dartford Heath (A2018);

(x) the circulatory system at Denham Roundabout between Denham Road (A412) and Oxford Road (A4020);

(y) both carriageways of the A21 between M25 Junction 5 (M26) and Chipstead Interchange (A25) and all the slip roads leading to and from this length of carriageway;

(z) the link road connecting from the London-bound carriageway of the M20 to the westbound carriageway of the M26 at Junction 3 (M26);

(aa) the link road connecting to the anti-clockwise carriageway of the M25 from the London-bound carriageway of the M20 at Junction 3 (M20 Junction 1/A20);

(bb)the slip road leading from the Junction 14 roundabout to the link road (connecting the westbound carriageway of the M25 Heathrow Spur Road to the clockwise carriageway of the M25) at Junction 14 (A3113);

(cc) the link road connecting the clockwise carriageway of the M25 to the eastbound carriageway of the M25 Heathrow Spur Road at Junction 14 (A3113); and

(dd)the circulatory system at M25 Junction 3 (M20 Junction 1/A20) between -
i) the slip road leading to the M20 coastbound and the slip road leading from the M20 London-bound; and
ii) slip road leading to the London-bound carriageway of the A20 and the slip road leading from the A20 coastbound.

These measures would be in the interests of road safety while contractors undertake carriageway works, pavement works, electrical works, structure works, surveys, barrier works, communication works, geotechnical works, vegetation works and all associated works. It is expected that the work would last for approximately 18 months starting on or after Monday 19th April 2021. The overnight closures would take place between 21:00 and 07:00 hours (maximum period).
The Order would come into force on 17th April 2021 and have a maximum duration of eighteen months. Traffic affected by the closures would be diverted via other {unctions of the M25, M20, M26, A2, A21, A282 or by using the M4, M23, A3, A20, A22, A23, A24, A25, A30, A40, A205, A217, A223, A224, A225, A232, A243, A245, A296, A320, A404, A437, A2018, A2022, A3044, A3113, A4020 and the B2174. The diversion route will vary depending on the closure in force.
The temporary closures and diversion routes would be clearly indicated by traffic signs when they are in operation during the works period.
J Downham, an Official of Highways England Co. Ltd. Ref: HE/SE/2021/M25/60 and HE/SE/2021/M25/64 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales. For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or

info@highwaysengland.co.uk

.

https://www.highwaysengland.co.uk


Attachments

MFN0603093.pdf Download

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices